Quadro worked in conjunction with WAMS Pty Ltd to resolve issues with a tripper chute at the Paraburdoo Mine site. WAMS is a uniquely experienced supplier of wear protection systems and performance management services to the mining, quarrying and minerals…
Quadro assisted Syntect Consulting Engineers with the Finucane Island Berth C Upgrade by providing a team of 1-2 people for 6 months to model the new Berth C components, per the MPD JV drawings, plus the existing Berth D, new…
Quadro Design has undertaken a large number of structural detailing projects, covering everything from: steelwork, concrete panels, ladders, platforms, storage bins, chutes, etc. All detail drawings included flattened patterns for any sheet metal items, plus the generation of DWG/DXF files…
Existing sites and plants with old and poor documentation can benefit from an up to date site layout, with flyaround & walk-through capability (using NavisWorks), to assist with operation & maintenance familiarisation & training. View PDF
Quadro has undertaken the modelling of existing mill liner systems in both Steel & Rubber for a variety of mine sites. In many instances, we have worked with the liner suppliers to address the following concerns: Time between replacement. Reduction…
In order to meet the current Worksafe WA requirements, a number of scissor lift trucks required detailed site measurement and thickness testing to allow them to be modelled and drawn in detail (the scissor lift mechanisms and bodies had been…
Quadro was tasked by Petroleum & Mining Engineering (PAME) to provide detailed fabrication drawings for an Subsea Valve Support Base, from the engineering drawings supplied by their client. The prime function of these drawings was to allow for cutting of…